August 17, 2026
Kongsberg Line Boring Bow Thruster
August 17, 2026
2 × VSP28 Propeller Housings – 1,297mm Bore Machining & 2,006mm Flange Facing
July 15, 2026
Wartsila 6L20 In-Situ Mains Crankshaft Honing & Superfinishing
July 15, 2026
Onsite Head Stud Removal and Recovery
June 11, 2026
Onsite Electroplating & Damaged Bore Restoration
June 11, 2026
In-Situ Crankpin Machining & Geometry Restoration
May 13, 2026
In-Situ Shaft Journal Machining & Sleeving
May 13, 2026